hfbs.fdotd7studies.comHoward Frankland Bridge Study ~ Project Overview

hfbs.fdotd7studies.com Profile

hfbs.fdotd7studies.com

Maindomain:fdotd7studies.com

Title:Howard Frankland Bridge Study ~ Project Overview

Description:The Florida Department of Transportation (FDOT) has future plans in motion to replace the aging northbound Howard Frankland Bridge which, built in 1960, is approaching the end of its’ serviceable life. A Project Development and Environment (PD&E) Study has begun to identify how this replacement will affect the surrounding environment.

Keywords:howard frankland bridge pde study, regional transit corridor evaluation, FDOT, florida department of transportation, hillsborough, pinellas, bridge study, project development and environment study...

Discover hfbs.fdotd7studies.com website stats, rating, details and status online.Use our online tools to find owner and admin contact info. Find out where is server located.Read and write reviews or vote to improve it ranking. Check alliedvsaxis duplicates with related css, domain relations, most used words, social networks references. Go to regular site

hfbs.fdotd7studies.com Information

Website / Domain: hfbs.fdotd7studies.com
HomePage size:30.358 KB
Page Load Time:0.338406 Seconds
Website IP Address: 132.148.207.242
Isp Server: Star Tribune Newspaper

hfbs.fdotd7studies.com Ip Information

Ip Country: United States
City Name: Minneapolis
Latitude: 44.980018615723
Longitude: -93.263580322266

hfbs.fdotd7studies.com Keywords accounting

Keyword Count
howard frankland bridge pde study0
regional transit corridor evaluation2
FDOT9
florida department of transportation3
hillsborough8
pinellas11
bridge study0
project development and environment study0

hfbs.fdotd7studies.com Httpheader

Date: Sat, 04 Jul 2020 06:18:16 GMT
Server: Apache
Upgrade: h2,h2c
Connection: Upgrade, Keep-Alive
Last-Modified: Wed, 25 Mar 2020 19:14:34 GMT
ETag: "1c2a81-7027-5a1b2adbdd848-gzip"
Accept-Ranges: bytes
Vary: Accept-Encoding,User-Agent
Content-Encoding: gzip
Content-Length: 8615
Keep-Alive: timeout=5
Content-Type: text/html

hfbs.fdotd7studies.com Meta Info

content="text/html; charset=utf-8" http-equiv="Content-Type"/
content="The Florida Department of Transportation (FDOT) has future plans in motion to replace the aging northbound Howard Frankland Bridge which, built in 1960, is approaching the end of its’ serviceable life. A Project Development and Environment (PD&E) Study has begun to identify how this replacement will affect the surrounding environment." name="description"
content="howard frankland bridge pde study, regional transit corridor evaluation, FDOT, florida department of transportation, hillsborough, pinellas, bridge study, project development and environment study" name="keywords"/

132.148.207.242 Domains

Domain WebSite Title

hfbs.fdotd7studies.com Similar Website

Domain WebSite Title
hfbs.fdotd7studies.comHoward Frankland Bridge Study ~ Project Overview
ukstudy.comStudy in the UK, search courses, universities and student information | Study in the UK - UK Study
dh.howard.eduDigital Howard @ Howard University | Howard University Research
bnwas.selmacontrol.comBNWAS SELMA Bridge Inspector – Bridge Navigational Watch Alarm System
web2.acbl.orgAmerican Contract Bridge League – ACBL | Your Best Partner in Bridge
acbl.orgAmerican Contract Bridge League – ACBL | Your Best Partner in Bridge
bridgestreet.dublinohiousa.govBridge Street District » Pedestrian Bridge
bridgeblogging.comBridge Blogging: Your #1 Bridge Blog Resource
littlebridge.comLearn English with Little Bridge - Little Bridge
studygroup.comStudy in the UK, Europe, USA, Canada, Australia or New Zealand with Study Group
efcollegestudytours.comFaculty Led Study Abroad | EF College Study Tours
personal.efcollegestudytours.comFaculty Led Study Abroad | EF College Study Tours
studymetro.comAbroad Study Overseas Education Consultant - Study Metro
overseas.studymetro.comAbroad Study Overseas Education Consultant - Study Metro
htm.pamplin.vt.eduHoward Feiertag Department of Hospitality & Tourism Management | Howard Feiertag Department of Hosp

hfbs.fdotd7studies.com Traffic Sources Chart

hfbs.fdotd7studies.com Alexa Rank History Chart

hfbs.fdotd7studies.com aleax

hfbs.fdotd7studies.com Html To Plain Text

TWO STUDIES – ONE BRIDGE CROSSING -- The Public Hearing for the Howard Frankland Bridge (I-275/SR 93) PD&E Study and Regional Transit Corridor Evaluation was held on November 14, 2017 at the Tampa Marriott Westshore and on November 16, 2017 at the Hilton St. Petersburg Carillon Park. Please click here for more information On May 4, 2018, the Florida Department of Transportation (FDOT), pursuant to 23 U.S. C. §327 and a Memorandum of Understanding dated December 14, 2016 and executed by the Federal Highway Administration and FDOT, granted Location and Design Concept Acceptance for: WPI Segment Number: 422799-1, Project Development and Environment (PD&E) Study for the Replacement of the Northbound Howard Frankland Bridge (I-275/SR 93) in Pinellas and Hillsborough Counties. The Public Hearing for the Howard Frankland Bridge (I-275/SR 93) PD&E Study and Regional Transit Corridor Evaluation originally scheduled for October 4th, 2016 at the Hilton St. Petersburg Carillon Park and October 6th, 2016 at the Tampa Marriott Westshore has been postponed until a later date. October 3, 2016 letter from FDOT to State Senator Latvala -- Click here to view a letter from Jim Boxold to Jack Latvala concerning the express lanes on the Howard Frankland Bridge. TWO STUDIES – ONE BRIDGE CROSSING Project Overview The Florida Department of Transportation (FDOT) has plans in motion to replace the aging northbound/eastbound portion of the Howard Frankland Bridge, which is approaching the end of its’ serviceable life. A Project Development and Environment (PD&E) Study is currently underway to identify the best replacement options and document how the replacement will affect the surrounding environment. In addition to the bridge replacement study, a key element of the Tampa Bay Area Regional Transportation Authority (TBARTA) Master Plan is to develop a transit connection across the Howard Frankland Bridge that will link Pinellas and Hillsborough counties via transit stations. The linkage provided between Pinellas County’s proposed Gateway Station and Hillsborough County’s Westshore Regional Multimodal Center will allow uninterrupted transit movements along the bridge. For this to be possible, however, the corridor must be capable of accommodating the appropriate transit provisions. Therefore, we will also conduct a Transit Corridor Evaluation Study to determine opportunities and constraints of providing a potential transit envelope in conjunction with bridge replacement. While the primary purpose of the PD&E study is to examine replacement of the bridge without increasing capacity, the transit study will examine how transit could be included in the bridge replacement construction. The transit study will examine engineering constraints and develop feasible alternatives to accommodate transit in the design of the replacement bridge, or determine if a new structure would be required. The study will review data gathered during the Pinellas County Alternatives Analysis (AA), which looked at providing premium transit service from Pinellas County to Hillsborough County. The study will also analyze data from the Westshore Multimodal Center Study . The Howard Frankland Bridge corridor must accommodate the appropriate transit provisions to connect all transit systems regionally. The two study processes are presented below: Click here to view a larger version Project Location Map Move your mouse cursor over the Howard Frankland Bridge to view an aerial photo. Click here for a larger map image A Regional Approach to Transportation The Howard Frankland Bridge is the central bridge spanning Old Tampa Bay from Clearwater/St. Petersburg to Tampa, Florida. It is one of three bridges connecting Pinellas County and Hillsborough County; the others being the Gandy Bridge and the Courtney Campbell Causeway. The Howard Frankland carries I-275 and is by far the most traveled of the bay area bridges; carrying an average of 139,000 vehicles per day across Tampa Bay. Given the importance of this connection, regional planning agencies such as the Tampa Bay Area Regional Transportation Authority (TBARTA) have developed multi-county transportation plans. Agencies like TBARTA and FDOT have been tasked with looking beyond county-specific congestion issues. State leaders are recognizing that traffic congestion does not start or stop at county lines nor do the solutions. That is why TBARTA’s Transportation Master Plan – which encompasses Citrus, Hernando, Pasco, Hillsborough, Pinellas, Manatee, and Sarasota Counties – has placed the Howard Frankland Bridge on its list of priority projects. As a first step in moving toward implementation of the TBARTA Master Plan two transit studies were conducted. The Hillsborough Area Regional Transit Authority (HART) conducted an alternative analysis (AA) for a light rail transit corridor running from the University of South Florida, through downtown Tampa, to the Westshore area. The second AA was conducted by TBARTA, FDOT, the Pinellas County Metropolitan Planning Organization (MPO) and the Pinellas Suncoast Transit Authority (PSTA) to evaluate the type and location of a premium transit corridor connecting downtown St. Petersburg, through the Pinellas Gateway area, and Clearwater. The Howard Frankland Bridge Transit Corridor Evaluation is vitally important as it will link these two transportation efforts as it connects Pinellas and Hillsborough Counties. Return to www.fdottampabay.com www.tbarta.com Join our Mailing List Email: -- The environmental review, consultation, and other actions required by applicable federal environmental laws for this project are being, or have been, carried out by the Florida Department of Transportation (FDOT) pursuant to 23 U.S. C. §327 and a Memorandum of Understanding dated December 14, 2016 and executed by the Federal Highway Administration and FDOT. Click here to view sitemap...

hfbs.fdotd7studies.com Whois

"domain_name": [ "FDOTD7STUDIES.COM", "fdotd7studies.com" ], "registrar": "GoDaddy.com, LLC", "whois_server": "whois.godaddy.com", "referral_url": null, "updated_date": [ "2020-04-27 16:31:42", "2020-04-27 16:31:40" ], "creation_date": "2008-07-15 22:36:22", "expiration_date": "2021-07-15 22:36:22", "name_servers": [ "NS63.DOMAINCONTROL.COM", "NS64.DOMAINCONTROL.COM" ], "status": [ "clientDeleteProhibited https://icann.org/epp#clientDeleteProhibited", "clientRenewProhibited https://icann.org/epp#clientRenewProhibited", "clientTransferProhibited https://icann.org/epp#clientTransferProhibited", "clientUpdateProhibited https://icann.org/epp#clientUpdateProhibited", "clientTransferProhibited http://www.icann.org/epp#clientTransferProhibited", "clientUpdateProhibited http://www.icann.org/epp#clientUpdateProhibited", "clientRenewProhibited http://www.icann.org/epp#clientRenewProhibited", "clientDeleteProhibited http://www.icann.org/epp#clientDeleteProhibited" ], "emails": [ "abuse@godaddy.com", "fdotd7studies.com@domainsbyproxy.com" ], "dnssec": "unsigned", "name": "Registration Private", "org": "Domains By Proxy, LLC", "address": [ "DomainsByProxy.com", "14455 N. Hayden Road" ], "city": "Scottsdale", "state": "Arizona", "zipcode": "85260", "country": "US"